▲

Flutter Gems is a curated list of 7000+ useful Dart & Flutter packages that are categorized based on functionality.

Discord Medium LinkedIn Twitter

Top Flutter Plots and Visualization packages

Last updated: October 19, 2025

Charts and plots are visual representations of data. They can be used to show trends, patterns, and relationships between different variables. Different types of charts are better suited for different types of data. For example, a line chart is often used to show how a variable changes over time, while a bar chart is better suited for comparing different groups of data.

The complete list of Flutter packages that can help you add Charts, Plots and Visualizations like line charts, bar charts, radial charts, pie charts, sparklines, speedometer, etc., in your Flutter app is provided below.


fl_chart Card Image
fl_chart
👍 6.95K   ⬇️ 1.1M
Dart 3 compatible
Maintenance Status: Good

A highly customizable Flutter chart library that supports Line Chart, Bar Chart, Pie Chart, Scatter Chart, and Radar Chart.

syncfusion_flutter_charts Card Image
syncfusion_flutter_charts
👍 3.56K   ⬇️ 317.5K
Dart 3 compatible
Maintenance Status: Good

A Flutter Charts library which includes data visualization widgets such as cartesian and circular charts, to create real-time, interactive, high-performance, animated charts.

syncfusion_flutter_gauges Card Image
syncfusion_flutter_gauges
👍 1.13K   ⬇️ 186.9K
Dart 3 compatible
Maintenance Status: Good

The Flutter gauges library includes a linear gauge and radial gauge (a.k.a. circular gauge) to create modern, interactive, animated gauges and radial sliders.

graphic Card Image
graphic
👍 853   ⬇️ 45.1K
Dart 3 compatible
Maintenance Status: Good

A grammar of data visualization and Flutter charting library.

flutter_echarts
👍 565   ⬇️ 3.2K
Dart 3 compatible
Maintenance Status: Poor

A data visualization charts library, based on Apache ECharts, able to build advanced charts like WebGL 3D, GIS map, etc.

pie_chart Card Image
pie_chart
👍 436   ⬇️ 35.8K
Dart 3 compatible
Maintenance Status: Average

A Flutter package for creating beautiful Pie Charts with awesome animation.

charts_painter
👍 306   ⬇️ 3.7K
Dart 3 compatible
Maintenance Status: Poor

Highly customizable and extendable charts library for flutter made with custom painters

flutter_audio_waveforms
👍 249   ⬇️ 4
Dart 3 compatible
Maintenance Status: Poor

A UI library for easily adding audio waveforms to your apps, with several customization options.

community_charts_flutter
👍 203   ⬇️ 42K
Dart 3 compatible
Maintenance Status: Average

Material Design charting library for flutter. Forked from google/charts.

gauge_indicator
👍 197   ⬇️ 36.6K
Dart 3 compatible
Maintenance Status: Poor

An animated, highly customizable, open source, Flutter gauge widget.

d_chart Card Image
d_chart
👍 205   ⬇️ 16K
Dart 3 compatible
Maintenance Status: Good

Simple way to show and use chart for Flutter with many option.

mrx_charts
👍 191   ⬇️ 6.8K
Dart 3 compatible
Maintenance Status: Poor

Simple, high-performance Flutter charts with beautiful animations.

flutter_flow_chart Card Image
flutter_flow_chart
👍 187   ⬇️ 1.1K
Dart 3 compatible
Maintenance Status: Good

draw a flow chart diagram with different kind of customizable elements. Dashboards can be saved for later use.

graphite Card Image
graphite
👍 180   ⬇️ 1.3K
Dart 3 compatible
Maintenance Status: Good

Flutter widget to easily draw direct graphs, trees, flowcharts. Includes gesture API to create graphs interactions.

diagram_editor Card Image
diagram_editor
👍 179   ⬇️ 490
Dart 3 compatible
Maintenance Status: Good

A flutter diagram editor library that provides DiagramEditor widget and a possibility to customize all editor design and behavior.

interactive_chart Card Image
interactive_chart
👍 178   ⬇️ 1.1K
Dart 3 compatible
Maintenance Status: Good

A candlestick chart that supports hand gestures such as pinch-to-zoom and panning.

k_chart
👍 173   ⬇️ 738
Dart 3 compatible
Maintenance Status: Poor

Add K chart in Flutter. Supports drag, scale, long press, fling.

geekyants_flutter_gauges Card Image
geekyants_flutter_gauges
👍 158   ⬇️ 3.7K
Dart 3 compatible
Maintenance Status: Average

A linear gauge package for Flutter that displays progress and can be customized for appearance and behavior.

candlesticks
👍 135   ⬇️ 857
Dart 3 compatible
Maintenance Status: Poor

A high-performance full featured candlesticks chart for all platforms.

chart_sparkline Card Image
chart_sparkline
👍 130   ⬇️ 6.8K
Dart 3 compatible
Maintenance Status: Good

Beautiful sparkline charts for Flutter. Average line, highest and lowest value.

primer_progress_bar Card Image
primer_progress_bar
👍 119   ⬇️ 1.3K
Dart 3 compatible
Maintenance Status: Average

Unofficial Flutter implementation of the progress bar defined in GitHub Primer Design System.

k_chart_plus_deeping Card Image
k_chart_plus_deeping
👍 117   ⬇️ 58
Dart 3 compatible
Maintenance Status: Good

Charts library which paint candle chart, depth chart in Exchange Application, experienced software developer open to new opportunities, reach out via Telegram @sandaohaizi .

audio_wave
👍 116   ⬇️ 1.2K
Dart 3 compatible
Maintenance Status: Poor

A highly customizable bar graph(or wave graph) with animation, color, radius, spaces, etc.

syncfusion_flutter_treemap Card Image
syncfusion_flutter_treemap
👍 109   ⬇️ 5.4K
Dart 3 compatible
Maintenance Status: Good

A Flutter Treemap library for creating interactive treemap to visualize flat and hierarchical data based on squarified, slice, and dice algorithms.

flutter_radar_chart
👍 100   ⬇️ 2.3K
Dart 3 compatible
Maintenance Status: Poor

Basic radar chart for Flutter. This chart is intended to work out of the box, adjusting itself to the given data. The design of the chart was inspired by the Python Graph Gallery.

flutter_charts
👍 94   ⬇️ 2.4K
Dart 3 compatible
Maintenance Status: Poor

Charts Library for Flutter, written in Dart with Flutter. Allows to create line chart and bar chart by specifying data as a simple array.

syncfusion_officechart Card Image
syncfusion_officechart
👍 90   ⬇️ 4.1K
Dart 3 compatible
Maintenance Status: Good

Syncfusion Flutter Office Chart is a library written natively in Dart for creating Office charts from scratch.

high_chart Card Image
high_chart
👍 89   ⬇️ 1.6K
Dart 3 compatible
Maintenance Status: Good

A chart library based on High Charts (.JS), able to build advanced charts like Pie chart, linear chart, etc.

flutter_graph_view Card Image
flutter_graph_view
👍 84   ⬇️ 980
Dart 3 compatible
Maintenance Status: Good

Widgets for beautiful graphic data structures, such as force-oriented diagrams.

vector_map
👍 78   ⬇️ 92
Dart 3 compatible
Maintenance Status: Poor

Vector map for Flutter. Highly customizable. Compatible with GeoJSON. Map chart. Pure Flutter.

radar_chart
👍 74   ⬇️ 875
Dart 3 compatible
Maintenance Status: Poor

A flexible Flutter radar/spider chart with super powers. Colors and Sizes are customizable.

fl_animated_linechart Card Image
fl_animated_linechart
👍 72   ⬇️ 603
Dart 3 compatible
Maintenance Status: Average

Animated flutter line & area chart. Performs with big datasets, support multiple y axis and datetime x axis

draw_graph
👍 70   ⬇️ 168
Dart 3 compatible
Maintenance Status: Poor

Do you want to display a graph in your app? This package can help. It has a widget that draws line graph for you.

material_charts Card Image
material_charts
👍 53   ⬇️ 1.3K
Dart 3 compatible
Maintenance Status: Good

A flutter library for creating and manage industrial standard charts

tiny_charts
👍 53   ⬇️ 321
Dart 3 compatible
Maintenance Status: Poor

Render sparkline charts for fast data visualization on Flutter apps.

fl_heatmap Card Image
fl_heatmap
👍 52   ⬇️ 575
Dart 3 compatible
Maintenance Status: Average

A heatmap widget for Flutter apps with various styling options.

chart_engine
👍 48   ⬇️ 1.1K
Dart 3 compatible
Maintenance Status: Good

Chart generator with interchangeable chart engines, like ChartJS and ApexCharts.

fl_nodes Card Image
fl_nodes
👍 45   ⬇️ 72
Dart 3 compatible
Maintenance Status: Good

A lightweight, scalable, and highly customizable package that empowers Flutter developers to create dynamic, interactive, and visually appealing node-based UIs.

body_part_selector Card Image
body_part_selector
👍 44   ⬇️ 197
Dart 3 compatible
Maintenance Status: Average

A beautiful selector for different body parts

gantt_chart
👍 43   ⬇️ 721
Dart 3 compatible
Maintenance Status: Poor

A fully customizable gantt chart package written purely in dart

awesome_circular_chart Card Image
awesome_circular_chart
👍 36   ⬇️ 9.5K
Dart 3 compatible
Maintenance Status: Average

Animated radial and pie charts for Flutter

cristalyse Card Image
cristalyse
👍 40   ⬇️ 943
Dart 3 compatible
Maintenance Status: Good

Cristalyse is a high-performance data visualization library for Dart/Flutter that implements grammar of graphics principles with native rendering capabilities.

mind_map Card Image
mind_map
👍 40   ⬇️ 423
Dart 3 compatible
Maintenance Status: Average

Mind map is a library that helps users create mind trees

vertical_barchart
👍 39   ⬇️ 2
Dart 3 compatible
Maintenance Status: Poor

Simple, responsive and beautiful Vertical BarChart.

stacked_bar_chart
👍 38   ⬇️ 11
Dart 3 compatible
Maintenance Status: Poor

A flutter library to draw graphs that can be scrolled as well as customized per the developers need.

org_chart Card Image
org_chart
👍 35   ⬇️ 948
Dart 3 compatible
Maintenance Status: Good

A flutter orgranizational chart with drag and drop, zoom and pan, search, collapse, expand, and easy customizations!

graphify Card Image
graphify
👍 35   ⬇️ 350
Dart 3 compatible
Maintenance Status: Good

A data visualization charts library, based on Apache Echarts, able to build advanced charts like WebGL 3D, Bar, Line, Candlestick, Radar, Graph, Tree etc.

echart_flutter
👍 34   ⬇️ 4
Dart 3 compatible
Maintenance Status: Poor

This is a library that make it easy to draw charts in Flutter.

spider_chart
👍 33   ⬇️ 187
Dart 3 compatible
Maintenance Status: Poor

Spider Chart is a simple spider/radar charting library for Flutter

multi_charts
👍 32   ⬇️ 1.4K
Dart 3 compatible
Maintenance Status: Poor

A Flutter package providing different types of charts built purely in dart.

flutter_vertical_heatmap Card Image
flutter_vertical_heatmap
👍 31   ⬇️ 34
Dart 3 compatible
Maintenance Status: Average

A vertical heatmap chart package for Flutter, offering beautifully crafted UI with ultimate flexibility!

d4
👍 29   ⬇️ 1.2K
Dart 3 compatible
Maintenance Status: Average

D4 is an ongoing project to port the D3 JavaScript library to the Dart language.

flutter_circle_chart
👍 29   ⬇️ 314
Dart 3 compatible
Maintenance Status: Poor

A Flutter package to create a Circle Chart with multiple drawing types. It will be useful for your awesome app.

line_chart
👍 28   ⬇️ 109
Dart 3 compatible
Maintenance Status: Poor

A simple flutter package to create a custom line chart

advanced_graphview Card Image
advanced_graphview
👍 27   ⬇️ 770
Dart 3 compatible
Maintenance Status: Good

Advanced Graphview enables users to create Tree, Graph, Topology UI with simple setup. This package can be used to display different flows.

sliver_bar_chart
👍 27   ⬇️ 84
Dart 3 compatible
Maintenance Status: Poor

A package that supports Bar Chart in a Flutter Sliver. This Package allow us to add Bar Chart in Sliver and its set a Bar Chart as a Header on Slivers Scroll.

pretty_gauge
👍 21   ⬇️ 5.8K
Dart 3 compatible
Maintenance Status: Poor

Fully customizable Gauge widget for Flutter with options for multiple segments, colors and customizable styling for displaying current value and text

kdgaugeview
👍 25   ⬇️ 366
Dart 3 compatible
Maintenance Status: Poor

KDGaugeView is a simple and customizable gauge control for Flutter

speedometer Card Image
speedometer
👍 23   ⬇️ 143
Dart 3 compatible
Maintenance Status: Average

A little widget that given an Observable gives you an updated SpeedOMeter.

flutter_gantt Card Image
flutter_gantt
👍 17   ⬇️ 958
Dart 3 compatible
Maintenance Status: Good

Flutter package for rendering an interactive and customizable Gantt chart widget.

flutter_plot
👍 17   ⬇️ 40
Dart 3 compatible
Maintenance Status: Poor

A pretty plotting package for Flutter apps.

k_chart_plus Card Image
k_chart_plus
👍 15   ⬇️ 117
Dart 3 compatible
Maintenance Status: Good

A Flutter Charts library which paint candle chart(support select multi secondary state), depth chart in Exchange Application.

progress_bar_chart Card Image
progress_bar_chart
👍 14   ⬇️ 422
Dart 3 compatible
Maintenance Status: Good

A package to display multipe values on a vertical chart using progess indicators and animation.

contribution_heatmap Card Image
contribution_heatmap
👍 13   ⬇️ 796
Dart 3 compatible
Maintenance Status: Good

A high-performance, GitHub-like contribution heatmap calendar widget for Flutter. Built with a custom RenderBox for maximum efficiency and full customization.

flutter_sales_graph Card Image
flutter_sales_graph
👍 9   ⬇️ 60
Dart 3 compatible
Maintenance Status: Average

A Flutter package for displaying sales data in a bar chart format.

pie_chart_sz Card Image
pie_chart_sz
👍 8   ⬇️ 90
Dart 3 compatible
Maintenance Status: Good

A Flutter package for creating beautiful Spaced Pie Charts Widget

horizontal_gauge Card Image
horizontal_gauge
👍 3   ⬇️ 54
Dart 3 compatible
Maintenance Status: Good

A customizable horizontal gauge widget for Flutter with smooth animations, interactive controls, and rich theming options.

bezier_chart
👍 248   ⬇️ 14

Maintenance Status: Poor

A beautiful bezier line chart widget for flutter that is highly interactive and configurable.

mp_chart
👍 113   ⬇️ 33

Maintenance Status: Poor

A Flutter chart package just like AndroidMPChart, apply easy to use chart for Flutter.

flutter_circular_chart
👍 91   ⬇️ 65

Maintenance Status: Poor

Animated radial and pie charts for Flutter

time_chart
👍 76   ⬇️ 178

Maintenance Status: Average

A scrollable time chart in Flutter. Currently supporting en, ko languages.

flutter_sparkline
👍 72   ⬇️ 126

Maintenance Status: Poor

Beautiful sparkline charts for Flutter.

flutter_visualizers
👍 67   ⬇️ 26

Maintenance Status: Poor

A Flutter plugin to Visualize the audio being played (only android).

charts_flutter_new
👍 50   ⬇️ 753

Maintenance Status: Poor

Material Design charting library for flutter with active support

chart_components
👍 49   ⬇️ 50

Maintenance Status: Poor

Two chart components for Flutter. Animated bar chart and animated calendar grid chart based on the github's one. Many properties to customize.

nimble_charts
👍 45   ⬇️ 773

Maintenance Status: Good

Charts for Flutter. A fork of charts_flutter

modern_charts
👍 45   ⬇️ 45

Maintenance Status: Poor

A package for creating simple yet modern looking charts.

flutter_annual_task
👍 45   ⬇️ 35

Maintenance Status: Poor

Flutter package for displaying grid view of daily task like Github-Contributions(Github calendar).

gauges
👍 41   ⬇️ 322

Maintenance Status: Poor

A library for customizable gauges (radial gauges only for now).

fldraw
👍 38   ⬇️ 58

Maintenance Status: Good

The open-source tldraw alternative for building infinite canvas apps in Flutter.

fcharts
👍 37   ⬇️ 54

Maintenance Status: Poor

A chart library for Flutter. Create beautiful, animated, responsive charts using a simple and intuitive API.

flutter_candlesticks
👍 30   ⬇️ 48

Maintenance Status: Poor

Elegant OHLC Candlestick and Trade Volume charts for Flutter.

flutter_k_chart
👍 23   ⬇️ 32

Maintenance Status: Poor

flutter_k_chart, Writted with pure dart, supported both iOS and Android.

flow_graph
👍 20   ⬇️ 35

Maintenance Status: Poor

DAG graph on flutter.

github_calendar
👍 18   ⬇️ 26

Maintenance Status: Poor

A calendar view like github repo contributions. It is a stateless widget, and help you to create a thermodynamic chart that show your users' activities.

customgauge
👍 17   ⬇️ 36

Maintenance Status: Poor

Fully customizable Gauge widget for Flutter with options for multiple segments, colors and customizable styling for displaying current value and text

pandapie
👍 16   ⬇️ 26

Maintenance Status: Poor

A fancy pie chart for pandas. Pandapie designed for new neumorphic design trend.

flutter_speedometer
👍 15   ⬇️ 30

Maintenance Status: Poor

Simple widget that let Flutter Devs can easily integrate speedometer to their apps with customizable options